9 firms bid for renovation of New Delhi railway station


Indian Railways has introduced {that a} whole of 9 worldwide and home firms have participated for the renovation of New Delhi Railway Station.

A few of the taking part companies embody Adani Railway Transport, ISQ Asia Infrastructure Investments and GMR Highways.

Different firms, resembling Anchorage Infrastructure Investments, BIF IV India Infrastructure, Omaxe Restricted, Alpis Ventures and Kalpataru Energy Transmission participated within the request for citation (RFQ) for the station restoration challenge.

In response to the report of PTI, now the technical analysis of those firms will probably be finished.

Within the subsequent part, Rail Land Growth Authority (RLDA) will subject a Request for Proposal (RFP) to the chosen candidates who qualify within the technical course of.

Pre-bid conferences and digital street exhibits have been additionally organized to persuade the stakeholders of a number of developments and get their suggestions.

NDLS Redevelopment, a flagship challenge of RLDA, is the primary challenge to be undertaken on the idea of Transit-Oriented Growth (TOD) in Delhi-NCR, India.

The challenge will probably be developed on the DBFOT mannequin at a capital expenditure of roughly $680 million.

The brand new station will probably be prepared in about 4 years, through which the concession interval has been mounted at 60 years.

The developer will obtain a number of income streams from the redevelopment challenge resembling income from actual property rights.

Strategically positioned within the coronary heart of New Delhi, the brand new station will function dome-shaped terminal buildings in addition to two arrival and departure areas on a concurrent stage.

The advanced will embody two multi-modal transport hubs on both sides, 40-storey high-rise twin towers and a walkway.

The blueprint of the event plan additionally consists of cycle tracks, pedestrian motion and inexperienced tracks.

The brand new station will probably be linked to Delhi-NCR by way of the Yellow Line and to Indira Gandhi Worldwide Airport by way of the Delhi Metro Airport Categorical Line.

DTC bus cease may also be current on both facet of the station.

The redeveloped station challenge will cowl an space of ​​120 hectares, of which 88 hectares will probably be deliberate in part one of many challenge. The grasp plan will probably be authorized by RLDA.

The identical PTI report means that an apex committee has additionally been shaped below the chairmanship of the Lieutenant Governor of Delhi to expedite clearances and clearances.

Associated Firms



Supply hyperlink